Kitchen Remodel Cost by Scope (Hillsborough County)
For an average Hillsborough County kitchen of 150 to 250 square feet, a cabinet reface runs $4,500 to $7,900, a mid-range remodel that keeps the layout $48,100 to $58,800 and one that moves walls, plumbing or gas $54,600 to $66,800. Contractors bid from published construction cost guides adjusted for Hillsborough County labor; GetProEstimate shows you that number first, then one licensed Hillsborough County contractor quotes to the same scope you saw.
Cabinet Reface
$4,500–$7,900
New doors and drawer fronts on your boxes. Counters kept.
Reface + New Countertops
$10,100–$15,100
Same layout, new counters.
Mid-Range, Same Layout
$48,100–$58,800
New cabinets, counters and appliances.
Mid-Range With Layout Changes
$54,600–$66,800
Moving some walls, plumbing or gas.
Full Gut, Average Kitchen
$62,700–$76,600
About 200 sq ft, layout changes, mid-grade cabinets and counters, standard appliance package.
Source: the construction cost guides contractors bid from, adjusted for Hillsborough County labor. Average kitchen = 150 to 250 sq ft. A full gut is priced from your room’s length and width.
What Drives the Price in Hillsborough County
Scope: a reface, new cabinets in the same layout, or moving walls, plumbing and gas.
Cabinets and counters, which are most of the material cost.
Kitchen size.
Electrical upgrades older homes need for today’s appliances.
Hillsborough County issues permits for unincorporated areas such as Brandon and Riverview; the City of Tampa, Plant City and Temple Terrace issue their own.
HOA architectural review for anything that changes the outside, like a window or an exterior vent.
The median Hillsborough County home was built in 1993, and close to half were built before 1990, so many kitchens here are on their first or second remodel. If you’re moving or removing a wall, the County’s alterations checklist asks for structural details sealed by a Florida architect or engineer. In a FEMA flood zone, check the 50% rule first: if the remodel costs half or more of the building’s market value, the whole house has to meet current flood rules. A cabinet reface usually stays well under that line; a full gut with new layout may not. The estimate reads the year your home was built from the County record. Source: U.S. Census Bureau, ACS 2024 1-year, tables B25034 and B25035; Hillsborough County, Residential Alterations & Renovations checklist; Hillsborough County, FEMA 50% Rule page.
Before You Sign
Check the license. Look up the contractor at myfloridalicense.com ("Verify a Licensee": search by name, license number, city or county). Since a 2021 state law (HB 735), not every trade needs a contractor license in Hillsborough County; for those, ask for proof of insurance. Source: Florida DBPR license search; Hillsborough County Development Services FAQ.
Recovery Fund notice. Any home-improvement contract over $2,500 must include the notice that payment, up to a limited amount, may be available from the Florida Homeowners’ Construction Recovery Fund if a licensed contractor’s violation causes you a loss. If it’s missing, ask why. Source: Florida Statutes §489.1425.
Lien law notice. Any direct contract over $2,500 for a home (up to four units) must include the construction lien warning, in capitalized 12-point bold type, signed by you. Unpaid subcontractors and suppliers can lien your home even if you paid the contractor, so get written lien releases before each payment. Source: Florida Statutes §713.015.
Notice of Commencement. For jobs over $5,000 (AC replacement under $15,000 is exempt), a recorded Notice of Commencement is part of the permit, and Florida law warns that not recording one "may result in your paying twice." Hillsborough County requires a recorded copy before the first inspection. Source: Florida Statutes §713.135; Hillsborough County permit checklists.
Big deposits. If you pay more than 10% up front, the contractor must apply for permits within 30 days and start work within 90 days after permits are issued, unless you agree in writing to longer. Source: Florida Statutes §489.126(2).
3-day cancellation: know when it applies. Florida’s home solicitation law gives you until midnight of the third business day to cancel a sale over $25 made at your home, but it excludes sales that result from your own request for specific goods or services. If you asked a contractor to come out for your project, don’t count on that window; read the contract’s own cancellation terms before you sign. Source: Florida Statutes §§501.021, 501.025, 501.031.
Roofing contracts. A roofer may not offer you cash, gifts or a deductible waiver to get an inspection or file a claim, and may not interpret your policy or adjust your claim without a public adjuster license. A roof contract must carry a notice of those prohibitions; if it’s missing, you can void the contract within 10 days of signing. After a declared state of emergency, if you sign a roof contract within 180 days of the event and you’re in the declared area, you can cancel without penalty within 10 days of signing or by the official start date, whichever comes first. Source: Florida Statutes §489.147.
Frequently Asked Questions
How much does a kitchen remodel cost in Hillsborough County?
$4,500 to $7,900 for a cabinet reface, $48,100 to $58,800 for a mid-range remodel in the same layout and $54,600 to $66,800 when walls, plumbing or gas move, for an average kitchen of 150 to 250 square feet. The estimate asks your kitchen’s size, the scope and the finish level.
How much does it cost to reface kitchen cabinets in Hillsborough County?
$4,500 to $7,900 for an average kitchen, or $10,100 to $15,100 with new countertops. A reface puts new doors and drawer fronts on your existing cabinet boxes and keeps the layout. It works when the boxes are sound and you like where everything is.
How long does a kitchen remodel take?
A cabinet reface takes a few days to a week. A mid-range remodel usually runs four to eight weeks and a full gut eight to twelve or more, plus permit time.
Who issues permits for a kitchen remodel in Hillsborough County?
Hillsborough County issues permits for unincorporated areas such as Brandon and Riverview; the City of Tampa, Plant City and Temple Terrace issue their own. Ask each contractor whether a permit is needed for your job and whether it’s in the price.
Does the FEMA 50% rule apply to my Tampa-area kitchen remodel?
It applies when the home is in a FEMA flood zone (A, AE, V, VE and similar) and the remodel costs 50% or more of the building’s market value, the County requires the whole house to meet current floodplain rules, which can mean elevating it. The Property Appraiser has a 50% Rule calculator; run it before you pick a scope.
Why does the estimate differ from a contractor’s quote?
The estimate is the published cost-guide price adjusted for Hillsborough County labor; a quote is one contractor’s price for one scope. The licensed Hillsborough County contractor you work with through GetProEstimate quotes to the same scope you saw.