ADU Cost by Type and Size (Hillsborough County)
A detached ADU in Hillsborough County typically runs $86,400 to $190,100 for 600 square feet and a garage conversion $43,600 to $95,700. Attached ADUs are quoted by the contractor. Contractors bid from published construction cost guides adjusted for Hillsborough County labor; GetProEstimate shows you that number first, then one licensed Hillsborough County builder quotes to the same scope you saw.
Detached ADU, 400 sq ft
$69,700–$153,200
Studio or one bedroom. Standard to high-end finishes.
Detached ADU, 600 sq ft
$86,400–$190,100
One bedroom. Standard to high-end finishes.
Detached ADU, 800 sq ft
$102,900–$226,700
Two bedrooms. Standard to high-end finishes.
Garage Conversion, 400 sq ft
$43,600–$95,700
With a kitchen and bath. Standard to high-end finishes.
Source: the construction cost guides contractors bid from, adjusted for Hillsborough County labor. Low end = standard finish, high end = high-end finish. Utility connections and site work vary by lot.
What Drives the Price in Hillsborough County
Type: a detached new build costs the most, a garage conversion the least per square foot.
Size and finish level.
Utility connections: water, sewer and power from the main house.
Foundation and site work.
Local zoning: where ADUs are allowed, size caps and setbacks.
Impact and connection fees from the city and utilities.
Hillsborough County issues permits for unincorporated areas such as Brandon and Riverview; the City of Tampa, Plant City and Temple Terrace issue their own.
Where you live sets the ADU rules. In the City of Tampa, a separate accessory unit is allowed in Seminole Heights, around Lowry Park, and in the East Tampa and Tampa Heights overlays, and the main home must be owner-occupied. Elsewhere in the city, a second unit is limited to family members, as an "Extended Family Residence." In unincorporated Brandon and Riverview, the County’s zoning applies, so confirm what your lot allows before you design. In a FEMA flood zone, County permits require full compliance with the floodplain rules, so price the foundation height in. Source: City of Tampa, Accessory Dwelling Units page (updated Jul 15 2026); Hillsborough County residential permit checklists (Special Flood Hazard Area compliance language).
Before You Sign
Check the license. Look up the contractor at myfloridalicense.com ("Verify a Licensee": search by name, license number, city or county). Since a 2021 state law (HB 735), not every trade needs a contractor license in Hillsborough County; for those, ask for proof of insurance. Source: Florida DBPR license search; Hillsborough County Development Services FAQ.
Recovery Fund notice. Any home-improvement contract over $2,500 must include the notice that payment, up to a limited amount, may be available from the Florida Homeowners’ Construction Recovery Fund if a licensed contractor’s violation causes you a loss. If it’s missing, ask why. Source: Florida Statutes §489.1425.
Lien law notice. Any direct contract over $2,500 for a home (up to four units) must include the construction lien warning, in capitalized 12-point bold type, signed by you. Unpaid subcontractors and suppliers can lien your home even if you paid the contractor, so get written lien releases before each payment. Source: Florida Statutes §713.015.
Notice of Commencement. For jobs over $5,000 (AC replacement under $15,000 is exempt), a recorded Notice of Commencement is part of the permit, and Florida law warns that not recording one "may result in your paying twice." Hillsborough County requires a recorded copy before the first inspection. Source: Florida Statutes §713.135; Hillsborough County permit checklists.
Big deposits. If you pay more than 10% up front, the contractor must apply for permits within 30 days and start work within 90 days after permits are issued, unless you agree in writing to longer. Source: Florida Statutes §489.126(2).
3-day cancellation: know when it applies. Florida’s home solicitation law gives you until midnight of the third business day to cancel a sale over $25 made at your home, but it excludes sales that result from your own request for specific goods or services. If you asked a contractor to come out for your project, don’t count on that window; read the contract’s own cancellation terms before you sign. Source: Florida Statutes §§501.021, 501.025, 501.031.
Roofing contracts. A roofer may not offer you cash, gifts or a deductible waiver to get an inspection or file a claim, and may not interpret your policy or adjust your claim without a public adjuster license. A roof contract must carry a notice of those prohibitions; if it’s missing, you can void the contract within 10 days of signing. After a declared state of emergency, if you sign a roof contract within 180 days of the event and you’re in the declared area, you can cancel without penalty within 10 days of signing or by the official start date, whichever comes first. Source: Florida Statutes §489.147.
Frequently Asked Questions
How much does an ADU cost in Hillsborough County?
$86,400 to $190,100 for a 600 square foot detached ADU and $43,600 to $95,700 for a 400 square foot garage conversion, from standard to high-end finishes. The estimate asks the type, size and finish level.
Is a garage conversion cheaper than a detached ADU?
Usually, yes: the walls, roof and slab are already there. A 400 square foot conversion runs $43,600 to $95,700, compared with $69,700 to $153,200 for a detached ADU of the same size.
How long does it take to build an ADU?
Construction usually runs four to eight months for a detached ADU and two to four for a garage conversion, plus design and permit time.
Who issues permits for an ADU in Hillsborough County?
Hillsborough County issues permits for unincorporated areas such as Brandon and Riverview; the City of Tampa, Plant City and Temple Terrace issue their own. Ask each contractor whether a permit is needed for your job and whether it’s in the price.
Can I build an ADU in Tampa?
In the City of Tampa, yes in Seminole Heights, the Lowry Park area and the East Tampa and Tampa Heights overlays, with the main home owner-occupied. In other parts of the city, a second unit is limited to family. Outside city limits, Hillsborough County zoning decides. Call the permit office for your address before paying for plans.
Why does the estimate differ from a builder’s quote?
The estimate is the published cost-guide price adjusted for Hillsborough County labor; a quote is one builder’s price for one scope. The licensed Hillsborough County builder you work with through GetProEstimate quotes to the same scope you saw.