Source: the construction cost guides contractors bid from, adjusted for Oakland County labor. Low to high = the finish and how much tile, from your answers.
What Drives the Price in Oakland County
Scope: cosmetic, new tile and fixtures, or moving the toilet and shower.
Tub-to-shower conversions.
Waterproofing behind the tile and a new shower valve, the two things low bids most often leave out.
Size.
Tile choice and amount.
Each city and township in Oakland County runs its own building department; in Troy, for example, the Building Department issues building, electrical, mechanical and plumbing permits.
Before You Sign
Check the license. In Michigan, a contractor offering home-improvement work of $600 or more in labor and materials must be licensed by LARA, as a Residential Builder (any remodel) or a Maintenance & Alteration contractor (the trades printed on the license). Contractors and their salespeople must carry a pocket card; ask to see it and look the license up on LARA’s license search. Source: MCL 339.2403(f), 339.2404(3); LARA, Helpful Information for Homeowners.
Electrical, plumbing and HVAC have their own licenses. Each needs a state license under Michigan’s Skilled Trades Regulation Act, and the license holder pulls the permit. Ask for each trade’s license number too. Source: MCL 339.5737, 339.5809, 339.6107.
Why the license matters to you. A contractor who needs a Michigan Residential Builder or M&A license but doesn’t have one can’t sue you to collect payment or put a lien on your home for that work. Source: MCL 339.2412(1), (3).
Get it in writing. LARA tells homeowners the contract should list the company name, address and phone, the license number, detailed specs (brands, colors, model numbers), all costs, start and finish dates, a statement that the contractor will get all required permits before work begins, insurance, the warranty, and the payment terms. Changes should be dated and initialed by both of you. Source: LARA, Helpful Information for Homeowners.
Ask for a sworn statement with each payment. Michigan’s lien law requires the contractor to give you a sworn statement listing every subcontractor and supplier when it asks for payment or when you demand one, and lets you hold back enough to pay the amounts listed. When a sub or supplier is paid in full, it owes you a full unconditional lien waiver. Source: MCL 570.1110, 570.1115.
Keep your proof of payment. If you’ve paid your contractor under the contract and a sub files a lien anyway, Michigan law lets you file an affidavit with the court, with your contract, change orders and canceled checks or receipts, and the lien doesn’t attach to your home to the extent you’ve paid. Source: MCL 570.1118a.
3-day cancellation: know when it applies. If a seller solicits you at home and you agree there to a purchase over $25, you can cancel until midnight of the third business day after you sign, by mailing or delivering written notice to the address in the contract’s cancellation notice. It doesn’t apply to sales arranged beforehand at the seller’s place of business, and you can give it up in a true emergency with a signed statement in your own handwriting. Read the contract’s own cancellation terms before you sign. Source: MCL 445.111(a), 445.112.
Lead-safe work in older homes. In a home built before 1978, anyone paid to disturb painted surfaces must be EPA lead-safe certified. Source: U.S. EPA, RRP Program.
Read the state’s consumer guide. LARA and NASCLA publish a Consumer Guide to Home Improvement Projects, which Troy’s building department links for residents. Source: City of Troy, Building Department.