A 600 sq ft detached ADU in Hernando County runs $80,300–$176,800. Get your number in about 2 minutes.

✓ One vetted contractor
✓ No bidding wars
✓ Free for homeowners

ADU Cost by Type and Size (Hernando County)

A detached ADU in Hernando County typically runs $80,300 to $176,800 for 600 square feet and a garage conversion $40,600 to $89,000. Attached ADUs are quoted by the contractor. Contractors bid from published construction cost guides adjusted for Hernando County labor; GetProEstimate shows you that number first, then one licensed Hernando County builder quotes to the same scope you saw.

Detached ADU, 400 sq ft
$64,800–$142,500
Studio or one bedroom. Standard to high-end finishes.
Detached ADU, 600 sq ft
$80,300–$176,800
One bedroom. Standard to high-end finishes.
Detached ADU, 800 sq ft
$95,700–$210,800
Two bedrooms. Standard to high-end finishes.
Garage Conversion, 400 sq ft
$40,600–$89,000
With a kitchen and bath. Standard to high-end finishes.

Source: the construction cost guides contractors bid from, adjusted for Hernando County labor. Low end = standard finish, high end = high-end finish. Utility connections and site work vary by lot.

What Drives the Price in Hernando County

Type: a detached new build costs the most, a garage conversion the least per square foot.
Size and finish level.
Utility connections: water, sewer and power from the main house.
Foundation and site work.
Local zoning: where ADUs are allowed, size caps and setbacks.
Impact and connection fees from the city and utilities.
The Hernando County Building Division issues permits for unincorporated Hernando, including Spring Hill, Hernando Beach and Weeki Wachee; the City of Brooksville runs its own Building Division.
Where you live sets the ADU rules. In unincorporated Hernando (Spring Hill and other areas outside Brooksville), the County’s ADU ordinance allows one accessory unit as an attached addition to an owner-occupied single-family home, sharing a wall or connected by a roofed breezeway no more than 30 feet long, and no larger than half the main home’s living area. It can have its own kitchen and bath, can’t be sold separately, and is meant for non-paying guests. Inside Brooksville, the City’s code allows an attached or detached accessory dwelling up to 900 square feet of living space on a lot of at least 7,000 square feet, with the main home owner-occupied. Either way, water and septic or sewer have to handle the extra people. Source: Hernando County Ordinance No. 2012-03 (Appendix A, Article II, Section 2.E, "Accessory Dwelling Unit"; Hernando Clerk, historical ordinances); City of Brooksville Land Development Code Sec. 4-8.2, "Accessory Dwelling Standards" (as published on Zoneomics). See Could not verify before publishing.

Before You Sign

Check the license. Look up the contractor at myfloridalicense.com ("Verify a Licensee": search by name, license number, city or county) and check County registration on Hernando County’s online permit portal, which also shows whether a permit was pulled. Hernando County has no handyman license, and since a 2021 state law (HB 735) not every trade needs one here: the County’s FAQ lists painting, flooring, like-for-like cabinets and pressure washing among work done without a contractor license, and the County ended twelve local specialty licenses on July 1 2023. For those trades, ask for proof of insurance. Source: Florida DBPR license search; Hernando County, Development Services FAQ; Hernando County Ordinance No. 2021-17.
Recovery Fund notice. Any home-improvement contract over $2,500 must include the notice that payment, up to a limited amount, may be available from the Florida Homeowners’ Construction Recovery Fund if a licensed contractor’s violation causes you a loss. If it’s missing, ask why. Source: Florida Statutes §489.1425.
Lien law notice. Any direct contract over $2,500 for a home (up to four units) must include the construction lien warning, in capitalized 12-point bold type, signed by you. Unpaid subcontractors and suppliers can lien your home even if you paid the contractor, so get written lien releases before each payment. Source: Florida Statutes §713.015.
Notice of Commencement. For jobs over $5,000 (AC replacement under $15,000 is exempt), a recorded Notice of Commencement is part of the permit, and Florida law warns that not recording one "may result in your paying twice." In Hernando County, it’s recorded at the County Recording Office and posted on the job site, and a certified copy of the recorded notice must be submitted before the first inspection. Source: Florida Statutes §713.135; Hernando County, Single Family Residence Permit & Check List and County permit applications (Notice of Commencement warning).
Big deposits. If you pay more than 10% up front, the contractor must apply for permits within 30 days and start work within 90 days after permits are issued, unless you agree in writing to longer. Source: Florida Statutes §489.126(2).
3-day cancellation: know when it applies. Florida’s home solicitation law gives you until midnight of the third business day to cancel a sale over $25 made at your home, but it excludes sales that result from your own request for specific goods or services. If you asked a contractor to come out for your project, don’t count on that window; read the contract’s own cancellation terms before you sign. Source: Florida Statutes §§501.021, 501.025, 501.031.
Roofing contracts. A roofer may not offer you cash, gifts or a deductible waiver to get an inspection or file a claim, and may not interpret your policy or adjust your claim without a public adjuster license. A roof contract must carry a notice of those prohibitions; if it’s missing, you can void the contract within 10 days of signing. After a declared state of emergency, if you sign a roof contract within 180 days of the event and you’re in the declared area, you can cancel without penalty within 10 days of signing or by the official start date, whichever comes first. Source: Florida Statutes §489.147.

Frequently Asked Questions

How much does an ADU cost in Hernando County?
$80,300 to $176,800 for a 600 square foot detached ADU and $40,600 to $89,000 for a 400 square foot garage conversion, from standard to high-end finishes. The estimate asks the type, size and finish level.
Is a garage conversion cheaper than a detached ADU?
Usually, yes: the walls, roof and slab are already there. A 400 square foot conversion runs $40,600 to $89,000, compared with $64,800 to $142,500 for a detached ADU of the same size.
How long does it take to build an ADU?
Construction usually runs four to eight months for a detached ADU and two to four for a garage conversion, plus design and permit time.
Who issues permits for an ADU in Hernando County?
The Hernando County Building Division issues permits for unincorporated Hernando, including Spring Hill, Hernando Beach and Weeki Wachee; the City of Brooksville runs its own Building Division. Ask each contractor whether a permit is needed for your job and whether it’s in the price.
Can I rent out an ADU in Spring Hill?
Under the County ordinance adopted in 2012, an accessory unit in unincorporated Hernando is an attached addition for non-paying guests of the owner-occupant, not a rental, and using it as a lodging or boarding house takes a Special Exception. Brooksville’s code sets its own standards. Confirm the current rule for your address with County Planning and Zoning or the City before paying for plans.
Why does the estimate differ from a builder’s quote?
The estimate is the published cost-guide price adjusted for Hernando County labor; a quote is one builder’s price for one scope. The licensed Hernando County builder you work with through GetProEstimate quotes to the same scope you saw.

More Cost Guides

Ready to see your number?Run your own estimate in about two minutes. No credit check.Who you’ll work with: a licensed Hernando County contractor for your trade; you can look up a Florida license at MyFloridaLicense.com before the appointment.

Get My Hernando County Estimate →