Canyon County ADU Guide 2026

How Much Does an ADU Cost in Canyon County?

A 600 sq ft detached ADU in Canyon County runs $81,200–$178,700. Get your number in about 2 minutes.

✓ One vetted contractor
✓ No bidding wars
✓ Free for homeowners

ADU Cost by Type and Size (Canyon County)

A detached ADU in Canyon County typically runs $81,200 to $178,700 for 600 square feet and a garage conversion $41,000 to $89,900. Attached ADUs are quoted by the contractor. Contractors bid from published construction cost guides adjusted for Canyon County labor; GetProEstimate shows you that number first, then one registered Idaho contractor quotes to the same scope you saw.

Detached ADU, 400 sq ft
$65,500–$144,000
Studio or one bedroom. Standard to high-end finishes.
Detached ADU, 600 sq ft
$81,200–$178,700
One bedroom. Standard to high-end finishes.
Detached ADU, 800 sq ft
$96,700–$213,100
Two bedrooms. Standard to high-end finishes.
Garage Conversion, 400 sq ft
$41,000–$89,900
With a kitchen and bath. Standard to high-end finishes.

Source: the construction cost guides contractors bid from, adjusted for Canyon County labor. Low end = standard finish, high end = high-end finish. Utility connections and site work vary by lot.

What Drives the Price in Canyon County

Type: a detached new build costs the most, a garage conversion the least per square foot.
Size and finish level.
Utility connections: water, sewer and power from the main house.
Foundation and site work.
Local zoning: where ADUs are allowed, size caps and setbacks.
Impact and connection fees from the city and utilities.
Inside Nampa, Caldwell and Middleton, the city building department issues permits; in unincorporated Canyon County, Canyon County Development Services issues building permits and the State of Idaho handles electrical, plumbing and HVAC permits.
Nampa rewrote its ADU rules in September 2026: one ADU per lot in residential zones, attached, internal or detached, up to 1,000 square feet when the main home is 1,334 square feet or larger (75% of the main home if it’s smaller), and the owner doesn’t have to live on the property. Plan for one off-street parking space unless an exception applies, such as the main home already having its required parking. Budget for fees beyond construction: Nampa lists plan review, permit, impact and utility hookup fees. Caldwell’s code today caps an ADU at the smaller of 900 square feet or 75% of the main home, with up to two bedrooms, but a 2026 Idaho law requires cities over 10,000 people, including Nampa and Caldwell, to allow ADUs of at least 1,000 square feet or 75% of the main home and to drop owner-occupancy rules by Feb. 1, 2027. Source: City of Nampa Ordinance No. 4948 (adopted Sept. 21, 2026), Nampa City Code Title 10, Chapter 29; Caldwell City Code §10-12-03-1(4) (Ord. 3670, 4-21-2025); Idaho Code §67-6541 (added 2026); U.S. Census Bureau, ACS 2024 5-year, table B01003.

Before You Sign

Check the registration. Look up the contractor on DOPL’s public search (edopl.idaho.gov). Idaho requires contractors to be registered, and an unregistered contractor gives up the right to put a lien on your home. Electricians, plumbers and HVAC installers hold separate state licenses, also searchable through DOPL. Source: Idaho Code §54-5204, §54-5208; Idaho Division of Occupational and Professional Licenses, Idaho Contractors Board (dopl.idaho.gov/con).
Get the required disclosure before you sign. On a home project over $2,000, the general contractor must give you a written disclosure before the contract is signed, and you sign that you received it. It tells you that you can ask for lien waivers from subcontractors, proof of liability and workers’ comp insurance, a surety bond, and extended title insurance (some at your cost). At final payment, the contractor owes you a list of the subcontractors and suppliers on the job. Source: Idaho Code §45-525 (failure to disclose is an unfair practice under the Idaho Consumer Protection Act, Title 48 Chapter 6).
Know your 3-day right to cancel. If you sign a contract at your home, the federal Cooling-Off Rule generally gives you until midnight of the third business day to cancel for a full refund (Saturdays count; Sundays and federal holidays don’t). It applies even when you invited the contractor; exceptions include emergencies and repair or maintenance visits you asked for. Idaho adds its own 3-day right for financed sales solicited at your home. Source: FTC, "Buyer’s Remorse: The FTC’s Cooling-Off Rule May Help" (16 CFR Part 429); Idaho Code §28-43-401 and §28-43-402.
Ask for the insurance certificates. To register, an Idaho contractor must carry general liability insurance, including completed operations, of at least $300,000, and show workers’ comp coverage or why it isn’t required. Ask for current certificates; the §45-525 disclosure confirms your right to request them. Source: Idaho Code §54-5210(1)(d)–(e); §45-525.
Look for the permit on site. Idaho building permits carry the contractor’s registration number, and permits must be posted at the job site. Source: Idaho Code §54-5209.

Frequently Asked Questions

How much does an ADU cost in Canyon County?
$81,200 to $178,700 for a 600 square foot detached ADU and $41,000 to $89,900 for a 400 square foot garage conversion, from standard to high-end finishes. The estimate asks the type, size and finish level.
Is a garage conversion cheaper than a detached ADU?
Usually, yes: the walls, roof and slab are already there. A 400 square foot conversion runs $41,000 to $89,900, compared with $65,500 to $144,000 for a detached ADU of the same size.
How long does it take to build an ADU?
Construction usually runs four to eight months for a detached ADU and two to four for a garage conversion, plus design and permit time.
Who issues permits for an ADU in Canyon County?
Inside Nampa, Caldwell and Middleton, the city building department issues permits; in unincorporated Canyon County, Canyon County Development Services issues building permits and the State of Idaho handles electrical, plumbing and HVAC permits. Ask each contractor whether a permit is needed for your job and whether it’s in the price.
Can my HOA stop me from building an ADU in Idaho?
Generally not. Idaho Code §55-3212 bars an HOA from adding or enforcing a covenant that limits or prohibits ADUs unless you agreed to it in writing. The HOA can still set reasonable rules on design, size, height, setbacks, open space, parking and bedrooms, so get its rules before you design.
How big can an ADU be in Nampa?
Under Nampa’s 2026 rules, up to 1,000 square feet if your home is 1,334 square feet or larger, or 75% of your home’s square footage if it’s smaller (measured as the whole structure, not the footprint). An ADU over 1,000 square feet attached to the house is treated as a duplex. Owner occupancy isn’t required.
How big can an ADU be in Caldwell?
Caldwell’s current code allows the smaller of 900 square feet or 75% of the main home, up to two bedrooms, with its own outside entrance and a design consistent with the main house. A 2026 state law requires Caldwell to allow at least 1,000 square feet or 75% of the main home by Feb. 1, 2027, so ask the City which rule applies on your permit date.
Why does the estimate differ from a builder’s quote?
The estimate is the published cost-guide price adjusted for Canyon County labor; a quote is one builder’s price for one scope. The registered Idaho contractor you work with through GetProEstimate quotes to the same scope you saw.